Ingeniero White Thermal Power Plant (‘CTIW’)

Located at Ingeniero White, district of Bahía Blanca, in a lot adjacent to CPB (thermal power plant ‘Piedra Buena’), CTIW consists of 6 dual-fuel (natural gas or fuel oil) Wärtsilä engines, with 100 MW installed power capacity, representing 0.2% of Argentine installed capacity. The engines are highly efficient, with a 46% performance rate.

The plant is interconnected to the 132 kV grid through a Transba (‘Empresa de Transporte de Energía Eléctrica por Distribución Troncal de la Provincia de Buenos Aires’) substation. Liquid fuel is supplied using CPB’s unloading and storage facilities and natural gas through CPB’s internal facilities.

From 2018 to 2023, its historical average annual generation was 281 GWh, with a generation record high of 312 GWh in 2019 and a record low of 229 GWh in 2020.

 

The following chart shows certain relevant statistical data on CTIW:

2022 2022
Net Generation (GWh) 308 265
Purchases of Energy (GWh)
Total Energy Sales (GWh) 308 265
Average Price (US$/MWh) 99 110
Average Gross Profit (US$/MWh) 73 86

Note: Gross Margin before depreciation and amortization.

 

Technical Data

Plant Unit Installed Capacity (MW) Efficiency Fuel Start-Up Type of Unit
CTIW BBLMDI01~06 100 42% Natural gas or fuel oil 2017 6 motor generators