Genelba Thermal Power Plant (‘CTGEBA’)

CTGEBA, located in the district of Marcos Paz, in the Province of Buenos Aires, has a strategic location since it is just one kilometer from the Ezeiza transforming station, a WEM (‘Wholesale Electricity Market’) reference node for the supply of electricity to the country’s highest demand area. CTGEBA began operating in 1999 and has two CC (‘combined cycle’), one with 684 MW installed capacity, consisting of two 223 MW gas turbines each, and a 239 MW steam turbine, repowered in October 2020. The second CC consists of a gas turbine with a 182 MW power capacity, known as Genelba Plus, installed in 2009 and repowered in June 2019, another gas turbine of 188 MW installed in 2019, and the 199 MW steam turbine commissioned on July 2, 2020, completing the expansion project started in 2017.

CTGEBA is one of the largest thermal power plants in the country, with a total installed capacity of 1,253 MW, representing 2.9% of Argentina’s installed capacity. From 2000 to 2023, its historical average annual generation was 5,294 GWh, with a generation record high of 8,594 GWh in 2021 and a record low of 3,438 GWh in 2001.

Visit virtially and get to know our thermal power plant Genelba. Click here to join the 360° virtual tour (Spanish).

 

 

The following chart shows certain relevant statistical data on CTGEBA:

2022 2023
Net Generation (GWh) 7,746 7,548
Purchases of Energy (GWh) 825 675
Total Energy Sales (GWh) 8,571 8,224
Average Price (US$/MWh) 39 37
Average Gross Profit (US$/MWh) 21 20

Note: Gross Margin before depreciation and amortization.

 

Technical Data

Plant Unit Installed Capacity (MW) Efficiency Fuel Start-Up Type of Unit
CTGEBA GEBATV01 239 1,253 56% Steam 1999 Steam turbine (combined cycle)
GEBATG01 223 Natural gas Gas turbine
GEBATG02 223
GEBATG03 (Plus) 182 53% 2009
GEBATG04 188 2019
GEBATV02 199 Steam 2020 Steam turbine (combined cycle)