Located on a site next to CPB, CTIW has a 100 MW installed capacity, standing for 0.2% of Argentina’s installed capacity, powered by 6 dual-fuel (natural gas or FO) Wärtsilä engines. Liquid fuel is supplied using CPB’s unloading and storage facilities, and natural gas through the plant’s internal facilities. From 2018 to 2025, its average annual generation was 221 GWh, with a generation record high of 312 GWh in 2019 and a record low of 134 GWh in 2025.
*Only available in spanish
The following chart shows certain relevant statistical data on CTIW:
| 2023 | 2024 | 2025 | |
|---|---|---|---|
| Net Generation (GWh) | 265 | 145 | 134 |
| Purchases of Energy (GWh) | – | – | – |
| Total Energy Sales (GWh) | 265 | 145 | 134 |
| Average Price (US$/MWh) | 110 | na | na |
| Average Gross Profit (US$/MWh) | 86 | 142 | na |
Note: Gross Margin before depreciation and amortization.
Technical Data
| Unit | Installed Capacity (MW) | Efficiency | Fuel | Start-Up | Type of Unit | Remuneration |
|---|---|---|---|---|---|---|
| BBLMDI01~06 | 100 | 42% | Natural gas or fuel oil | 2017 | 6 motor generators | PPA 21/16 |