Located on a site adjacent to CPB, CTIW has a 100 MW installed capacity, representing 0.2% of Argentina’s installed capacity, through 6 dual-fuel (natural gas or FO) Wärtsilä engines and with a 46% performance rate. Liquid fuel is supplied using CPB’s unloading and storage facilities, and natural gas through the plant’s internal facilities. From 2018 to 2024, its average annual generation was 262 GWh, with a generation record high of 312 GWh in 2019 and a record low of 145 GWh in 2024.
*Only available in spanish
The following chart shows certain relevant statistical data on CTIW:
2023 | 2024 | |
---|---|---|
Net Generation (GWh) | 265 | 145 |
Purchases of Energy (GWh) | – | – |
Total Energy Sales (GWh) | 265 | 145 |
Average Price (US$/MWh) | 110 | – |
Average Gross Profit (US$/MWh) | 86 | 142 |
Note: Gross Margin before depreciation and amortization.
Technical Data
Unit | Installed Capacity (MW) | Efficiency | Fuel | Start-Up | Type of Unit | Remuneration |
---|---|---|---|---|---|---|
BBLMDI01~06 | 100 | 42% | Natural gas or fuel oil | 2017 | 6 motor generators | PPA 21/16 |