Ingeniero White Thermal Power Plant (‘CTIW’)

Located on a site adjacent to CPB, CTIW has a 100 MW installed capacity, representing 0.2% of Argentina’s installed capacity, through 6 dual-fuel (natural gas or FO) Wärtsilä engines and with a 46% performance rate. Liquid fuel is supplied using CPB’s unloading and storage facilities, and natural gas through the plant’s internal facilities. From 2018 to 2024, its average annual generation was 262 GWh, with a generation record high of 312 GWh in 2019 and a record low of 145 GWh in 2024.

*Only available in spanish

 

The following chart shows certain relevant statistical data on CTIW:

2023 2024
Net Generation (GWh) 265 145
Purchases of Energy (GWh)
Total Energy Sales (GWh) 265 145
Average Price (US$/MWh) 110
Average Gross Profit (US$/MWh) 86 142

Note: Gross Margin before depreciation and amortization.

 

Technical Data

Unit Installed Capacity (MW) Efficiency Fuel Start-Up Type of Unit Remuneration
BBLMDI01~06 100 42% Natural gas or fuel oil 2017 6 motor generators PPA 21/16