EcoEnergía, located on the outskirts of the City of Bahía Blanca, is a cogeneration power plant within TGS’s General Cerri Complex. It consists of a 14 MW ST powered by steam generated by a heat recovery boiler that uses the exhaust gases from Cerri compressors. From 2012 to 2025, its average annual generation was 81 GWh, with a record high of 108 GWh in 2018 and a record low of 54 GWh in 2025.
*Only available in spanish
The following chart shows certain relevant statistical data on EcoEnergía:
| 2023 | 2024 | 2025 | |
|---|---|---|---|
| Net Generation (GWh) | 68 | 70 | 54 |
| Purchases of Energy (GWh) | 78 | 80 | 69 |
| Total Energy Sales (GWh) | 146 | 150 | 123 |
| Average Price (US$/MWh) | 39 | 36 | 39 |
| Average Gross Profit (US$/MWh) | 13 | 10 | 14 |
Note: Gross Margin before depreciation and amortization.
Technical Data
| Unit | Installed Capacity (MW) | Efficiency | Fuel | Start-Up | Type of Unit | Remuneration |
|---|---|---|---|---|---|---|
| CERITV01 | 14 | 35% | Steam | 2011 | Co-generation steam turbine | Res. SE No. 400/25 |