PEPE 2, located on provincial route 51, 18 km from the city of Bahía Blanca, in the province of Buenos Aires, was commissioned in May 2019 with a 53 MW installed capacity, representing 0.1% of Argentina’s installed capacity. Its 14 V-136 Vestas wind turbines, each with a 3.8 MW capacity, have a 120-meter hub height and a 56% net load factor (P50). Since 2020, its average annual generation has been 197 GWh. PEPE 2 and PEPE 3 are registered to issue IREC certificates.
*Only available in spanish
The following chart shows certain relevant statistical data on PEPE II:
| 2023 | 2024 | 2025 | |
|---|---|---|---|
| Net Generation (GWh) | 209 | 188 | 206 |
| Purchases of Energy (GWh) | 4 | 13 | 9 |
| Total Energy Sales (GWh) | 213 | 201 | 215 |
| Average Price (US$/MWh) | 74 | 81 | 89 |
| Average Gross Profit (US$/MWh) | 55 | 49 | 48 |
Note: Gross Margin before depreciation and amortization.
Technical Data
| Unit | Installed Capacity (MW) | Start-Up | Type of Unit | Remuneration |
|---|---|---|---|---|
| PAMEEO | 53 | 2019 | 14 wind generators | MAT ER |