PEPE 2, located on provincial route 51, 18 km from the city of Bahía Blanca, in the province of Buenos Aires, was commissioned in May 2019 with a 53 MW installed capacity, representing 0.1% of Argentina’s installed capacity. Its 14 V-136 Vestas wind turbines, each with a 3.8 MW power capacity, have a 120-meter hub height and a 56% net load factor of P50. Since 2020, its average annual generation has been 195 GWh.
*Only available in spanish
The following chart shows certain relevant statistical data on PEPE II:
2023 | 2024 | |
---|---|---|
Net Generation (GWh) | 209 | 188 |
Purchases of Energy (GWh) | 4 | 13 |
Total Energy Sales (GWh) | 213 | 201 |
Average Price (US$/MWh) | 74 | 81 |
Average Gross Profit (US$/MWh) | 55 | 49 |
Note: Gross Margin before depreciation and amortization.
Technical Data
Plant | Unit | Installed Capacity (MW) | Start-Up | Type of Unit |
---|---|---|---|---|
PEPE II | PAMEEO | 53 | 2019 | 14 wind generators |