Investor Relations
es en

Ingeniero White Thermal Power Plant (‘CTIW’)

Located on a site next to CPB, CTIW has a 100 MW installed capacity, standing for 0.2% of Argentina’s installed capacity, powered by 6 dual-fuel (natural gas or FO) Wärtsilä engines. Liquid fuel is supplied using CPB’s unloading and storage facilities, and natural gas through the plant’s internal facilities. From 2018 to 2025, its average annual generation was 221 GWh, with a generation record high of 312 GWh in 2019 and a record low of 134 GWh in 2025.

*Only available in spanish

 

The following chart shows certain relevant statistical data on CTIW:

2023 2024 2025
Net Generation (GWh) 265 145 134
Purchases of Energy (GWh)
Total Energy Sales (GWh) 265 145 134
Average Price (US$/MWh) 110 na na
Average Gross Profit (US$/MWh) 86 142 na

Note: Gross Margin before depreciation and amortization.

 

Technical Data

Unit Installed Capacity (MW) Efficiency Fuel Start-Up Type of Unit Remuneration
BBLMDI01~06 100 42% Natural gas or fuel oil 2017 6 motor generators PPA 21/16