In Salta, CTP is located in the small village of Piquirenda, Municipality of Aguaray, Department of General San Martín. Finished in 2010, it has a 30 MW capacity, consisting of ten GE Jenbacher JGS 620 gas-fired engines, representing 0.1% of Argentina’s installed capacity. From 2011 to 2024, its average annual generation was 99 GWh, with a record high of 156 GWh in 2017 and a record low of 52 GWh in 2022.

*Only available in spanish

The following table shows the most relevant statistical data on CTP:

2023 2024
Net Generation (GWh) 75 59
Purchases of Energy (GWh)
Total Energy Sales (GWh) 75 59
Average Price (US$/MWh) 24 30
Average Gross Profit (US$/MWh) 4 3

Note: Gross Margin before depreciation and amortization.

 

Technical Data

Unit Installed Capacity (MW) Efficiency Fuel Start – Up Type of Unit Remuneration
PIQIDI01 30 40% Natural gas 2011 Internal combustion engines Spot