PEPE 4, adjacent to PEPE 3, contributes 81 MW, equivalent to 0.2% of the country’s installed capacity through 18 V-150 Vestas wind turbines of 4.5 MW each, with a hub height of 105 meters and a 63% net load factor of P50. Since 2023, its average annual generation has been 205 GWh.
*Only available in spanish
The following chart shows certain relevant statistical data on PEPE IV:
2023 | 2024 | |
---|---|---|
Net Generation (GWh) | 274 | 341 |
Purchases of Energy (GWh) | – | – |
Total Energy Sales (GWh) | 274 | 341 |
Average Price (US$/MWh) | 65 | 64 |
Average Gross Profit (US$/MWh) | 60 | 57 |
Note: Gross Margin before depreciation and amortization.
Technical Data
Plant | Unit | Installed Capacity (MW) | Start-Up | Type of Unit |
---|---|---|---|---|
PEPE IV | PE32EO | 27 | 2023 | 6 wind generators |
PEP3EO | 54 | 12 wind generators |