To the north of Greater Buenos Aires, in the Industrial Complex of the district of Pilar, CTPP has a 100 MW capacity, 0.2% of the country’s installed capacity, through 6 Wärtsilä motor generators. CTPP may consume FO stored in its own tanks or natural gas supplied through a dedicated gas pipeline connected to TGN’s main gas pipeline. From 2018 to 2025, its historical average annual generation was 213 GWh, with a generation record high of 321 GWh in 2022 and a record low of 139 GWh in 2025.
*Only available in spanish
The following chart shows certain relevant statistical data on CTPP:
| 2023 | 2024 | 2025 | |
|---|---|---|---|
| Net Generation (GWh) | 274 | 192 | 139 |
| Purchases of Energy (GWh) | – | – | – |
| Total Energy Sales (GWh) | 274 | 192 | 139 |
| Average Price (US$/MWh) | 135 | na | na |
| Average Gross Profit (US$/MWh) | 107 | na | na |
Note: Gross Margin before depreciation and amortization.
Technical Data
| Unit | Installed Capacity (MW) | Efficiency | Fuel | Start-Up | Type of Unit | Remuneration |
|---|---|---|---|---|---|---|
| PILBDI01~06 | 100 | 45% | Natural gas or fuel oil | 2017 | 6 motor generators | PPA 21/16 |