Pichi Picún Leufú Hydro Power Plant (‘HPPL’)

The HPPL plant, located in the province of Neuquén, on the Limay River, started operating in 1999 under a 30-year concession. HPPL has a 285 MW installed capacity distributed in 3 Kaplan-type turbines, representing 0.6% of Argentina’s total installed capacity. The dam is made up of loose materials with a waterproof concrete side. It has a length of 1,045 m, a maximum height of 54 m and a crest of 480 m above sea level. Between 2000 and 2024, HPPL recorded an average annual generation of 912 GWh, with a record high of 1,430 GWh in 2006 and a record low of 494 GWh in 2016. HPPL’s concession is 100% owned by Pampa.

 

*Only available in spanish

 

The following chart shows certain relevant statistical data on HPPL:

2023 2024 2025
Net Generation (GWh) 1.060 890 558
Purchases of Energy (GWh)
Total Energy Sales (GWh) 1.060 890 558
Average Price (US$/MWh) 11 13 20
Average Gross Profit (US$/MWh) 4 5 7

Note: Gross Margin before depreciation and amortization.

 

Technical Data

Unit Installed Capacity (MW) Start-Up Remuneration
PPLEHI 285 1999 Res. SE No. 34/26